Monday, July 16, 2012

Stripping the Fireplace

I've been looking at this paint job for four years, wondering what beautiful bricks might be beneath the tan, white, maroon and peach layers. 


I like to do my research before tacking a new project, soI've read a few other blog posts about stripping paint from fireplace brick. Checking these posts helps me get pumped up to take on the project! I want to give a special shout out to a few of you:
I went into this project expecting the worst. I expected difficult labor, lots of time, elbow grease, strippers, soda blasters, brushes, drips, stink and a very unhappy husband.


So I gathered some supplies... I am using a few different brands of each product that we have left over in the basement. On the woodwork we've been using Smart Strip, but I wanted to polish off the other cans of product in the basement.


Then I ran some tests. First, applying chemical stripper straight onto the painted brick. A test with stripper applied to the paint:


Stripper alone doesn't cut it. Even two applications didn't get to the first layer of paint. This might be a point where a specific product would be preferred (insert your favorite product here).

In another spot, I tried hitting the paint with the heat gun, scraping off what I could, and then going after it with the chemical stripper. The heat gun made a huge different, as you can see. It really loosened the paint's grip on the brick. It wasn't too impressive though- it felt like trying to comb gum from your hair. Really stick gum. And not your hair, but maybe a teddy bear's hair. But after the heat gun, the stripper worked very well.

 

The heat gun takes roughly 3-5 minutes per brick, and I use my painter's tool in a chiseling fashion, scraping away some of the paint.


The chemical stripper sits on the brick for about 15 minutes. Then I scrap off some goo with a plastic scraper. Next, I dunk a wire brush or steel wool (I use either and my preference varies as I work) in mineral spirits and scrub off the residue. It takes about 5-6 minutes to scrub each brick and the neighboring mortar.


I haven't used the vinegar to remove the residue yet because when I went to grab it from below the sink, I saw a Magic Eraser and thought that would be an interesting experiment. Of course, the eraser disintegrates quickly, but it definitely did the job. However, it doesn't really get into the crevices well. I'm hoping vinegar and a towel will have better results. But still, not bad. This last picture shows a few bricks that I wiped down with the eraser. You can see a slight change in the color- the flatter gray is residue stained by the mortar. The bricks themselves are a color similar to sidewalk concrete.




I took this picture before finishing for the day. I have about half of this side of the fireplace cleaned down to the brick and it took about half a day. It's really not bad at all. I feel very lucky that it's going this well!

Sunday, June 12, 2011

More Time in the Yard

Yard work kept on through Friday. The vines came down off the fence.

Before (side view):


After (looking straight on):


Then Norm came over to help us remove the holly. It was growing too close to the house and was well on it's way to damaging the eaves.



Saturday I spent several hours stripping one side of the closet door for the office/guest room.


It's not quite done, but it's close. I'm debating whether I want to strip the interior facing side of the door. It's roughly 4 hours worth of labor that I'd rather put towards something else. So I may just sand it to clean up, and repaint. Or I may give in to the guilt and strip the paint anyway.

So far as a day spent stripping paint goes, it was pretty awesome. I had music playing, it was warm and I was well shaded by the giant fig tree.


When I decided to call it day, I still had enough motivation to clean up the front room, which has been a disaster area since starting the office project. Yep, it was a good day.


So, how did you spend your weekend?

Monday, March 28, 2011

2011 Forecast

In October 2010, this post described our progress, relating to a list posted earlier in the year (here: 2010 Forecast). We had barely touched the list! Our good intentions meant very little once the home improvement ball was rolling.

Last summer, the City sent us, along with our neighbors, a letter explaining the City's plan to replace our sewer. Good news, right? Did I mention that replacing our fully functional sewer connection will be at our cost? It isn't how we'd hoped to spend that chunk of money, but there is no way around it, so we have to bite the bullet.

This impacted our 2010 list, and will also play into our 2011 list. We can't very well build a retaining wall when it might be damaged by work in the street, and possibly in our yard. So that project has been simmering on the back burner, for a while. I just said simmering, didn't I? More like ice cold. Bummer.

Fortunately, the NE Portland Bungalow still has plenty of home improvement projects to chose from. Here is our pipe dream proposed "To Do" list for the remaining three quarters of 2011:

1.) The exterior:
-remove the poured concrete patio/sidewalk and replace with pavers
-fix the gutters and dig french drains
-prune the out of control fig tree
-remove old plants, till/level the yard, and replant grass
-build a shed for the grill, mower and other lawn care tools

The backyard has seen (and will see) better days:

Here's a peak at the monster fig tree:

There is a lot to say about this tree, and it could have an entire post just for itself. Maybe it will someday.

2.) The current TV room:
-remove wall paper, strip paint, repaint
-repair plaster
-remove door to bathroom and frame in wall instead

The current TV room:

The room is currently egg-salad-yellow paint over wallpaper, has about 5 layers of paint on trim, and has plenty of damaged plaster (not to mention holes in the plaster from insulating the room). This project should be very similar to the dining room project, and will hopefully go much faster.

(at this point, we'll play Musical Rooms, moving our bed to that room)

3.) The current bedroom:
-repair plaster (no wallpaper- woohoo!!)
-strip paint, repaint
-restore sash windows

The current bedroom:

This picture was taken during the insulation project, in November 2009. Clearly, this room will need lots of plaster repair. Fortunately, there is no wall paper to strip, but there are sash windows to restore. I'm excited for that experience, but intimidated by the unknown.

4.) And everyone's favorite category, miscellaneous:
-if we're ever really feeling ambitious, strip some paint off the fire place brick

If anyone has any good tips or stories relating to french drains, restoring sash windows, landscaping or anything else, please do share- advice might be just want the doctor ordered!

Saturday, June 12, 2010

Still stripping paint

First, I apologize for the lack of photos. Photos account for about 95% of the fun in a house blog, I think. I hope to add an updated photo with this post, soon.

It's been longer than usual, between posts, but we HAVE been working! We're nearing the end of the dining room project and it's hard to believe it's taken so long. I bet if we dedicate 3 or 4 weekends on the next room, we could get just as much done in that time frame. (Famous last words, maybe?)

Slow progress is still progress! We have the paint stripped now, and are about 30% through the "light sand" and hoping to finish the sanding, and the last plaster touch ups this week/weekend.

It's going to be great to take down the plastic over the doorway, and finally see (and USE!) our dining room.